As of Friday, February 23:
• Construction vehicles continue to travel to and from the construction site entrance via Gregory Road.
• Traffic supervisors are in place for traffic safety.
• Walking pathways in the back of the school have been recovered with woodchips.
• There is a new a gravel crush path on the walkway from the school to the Cedar Hill Road bus stop.
• There is a new snow fence at the front of the school around three trees to protect the tree roots and prevent students from walking on the muddy grounds in that area.

Questions and concerns can be directed to facility@sd61.bc.ca.